I. W. Abel Building

To contact us by mail:

United Steelworkers
Local 3657
Five Gateway Center
Pittsburgh, PA
15222


or by email: click here

  • 1964 - Construction of the Five Gateway Center building was completed. The building features a unique "open scape" concept of engineering, which eliminated the usual type of interior support columns. Support columns are located on the outside and at the central elevator shafts.
  • 1973 - The USW purchased the building as its new International Headquarters from Equitable Life Assurance. USW occupancy was completed in April.
  • 1976 - USW constructs Steelworkers Plaza alongside the headquarters, which included a fountain, benches, and greenery.
  • 1986 - A USW media center was installed on the eighth floor with video editing and satellite capability to receive and transmit video broadcasts throughout the world.
  • 1988 - USW interior offices remodeled.
  • 1989 - Updated fire/life-safety system installed.
  • 1989 - On September 25, the building was dedicated as the I. W. Abel (1908-1987) Building.
  • 1996 - Steelworkers Plaza renovated and fountain removed to provide rally center.
  • 2001 - 13th Floor renovated to construct International Executive Board meeting room and updated Media Center with video conferencing capabilities.
  • 2006 - The dedication of the 2nd floor training areas as the George and Jane Becker Collective Bargaining and Political Mobilization Center .
  • 2006 - The dedication of the 13th floor as the Bernard Kleiman Conference Center .


 


 Upcoming Events
S M T W T F S
29
30
31
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
01
02